Countdown: Week 15 Dyneema®

This was a pretty productive weekend. I had hoped to get started on the Monitor install but instead got all of the New England Ropes (Dyneema) halyards run as well as one of the genoa sheets. I had a very simple method planned for swapping out the old halyards. I was going to tape the old halyard to the 5mm Dyneema®, run it back up the mast, over the sheave and down. Then I thought I would just tape the new halyard on and run it back up. I tried it Friday night and it worked great until the new halyard got back up to the sheave. Apparently the tight turn was too much for the tape and the halyard and 5mm fell back down. ...

June 5, 2011 · 3 min · Tucker Bradford

Aft Cabin Lighting

I was all excited to start working on the new windlass install when I heard Olive yell, “Daaaaddyy. Can you please turn on the light. I can’t do it.” Within minutes I was tearing the boat apart looking for the source of the problem. A problem that got worse as I went. Before the end of the following day we had no lights in the aft cabin or galley. What’s worse, most of the cable for those lights were the original 40 year old run, so it was built right into one of the few parts of the boat that I have no access to. My only recourse was to rewire the whole system. ...

January 21, 2011 · 2 min · Tucker Bradford